The period of permanent measurement was : 1st July - 31 July 2007 The operation was continuous (minimum of 1 reading per day). The rain gauge reading was taken manually in irregular intervals (once or
The period of permanent measurement was : 1st July - 31 July 2007. The operation was continuous, with a daily check. The precipitation rate was measured with a sampling of 10sec with an optical UV hygrometer.