No access to data on tapes from friday, 26-June-2026, 8:00 CEST.Due to the migration of our HSM system there will be no access to data stored on tapes from friday, 26-June-2026, 8:00 CEST. The migration is planned to last at least 10 days.
The 1986 UKLO equilibrium runs include a 2xCO2 run at 48x36 global resolution. We received monthly 15-year climatologies of maximum, minimum, and mean surface temperature, surface wind speed, sea-level
The 1986 UKLO equilibrium runs include a control (1xCO2) run at 48x36 global resolution. We received monthly 15-year climatologies of maximum, minimum, and mean surface temperature, surface wind speed,