This dataset contains a COSMO-CLM (CCLM6) simulation for 2008–2017 with the offshore wind farms planned for 2050 in the North Sea and the Baltic Sea, without the additional development zones, about 300 GW of installed capacity in the North Sea. The wind farms are represented by the Fitch wind-farm parameterisation, using the IEA 15 MW reference turbine with a 150 m hub height. Unlike the MAX runs, the turbine density in each wind-farm area follows the capacity density planned by each country. Domain, grid (rotated pole, 0.045° ≈ 5 km, 789 × 558 cells), time period and output format are the same as in the control run: hourly data in monthly NetCDF files, proleptic Gregorian calendar, UTC. The variables are wind speed at 10 m and at hub height (150 m) and total precipitation. Note: the model output for 150 m wind speed ends in November 2017. The file for December 2017 (WS_150M_201712, 1–30 December) was derived from the 10 m wind with a power law (α = 1/7) and is not model output.