This dataset contains a COSMO-CLM (CCLM6) simulation for 2008–2017 with a maximum offshore wind build-out for 2050 in the North Sea and the Baltic Sea. The layout includes all planned wind farms plus the designated development zones, about 600 GW of installed capacity in the North Sea. The wind farms are represented by the Fitch wind-farm parameterisation, using the IEA 10 MW reference turbine with a 119 m hub height. The model places turbines at a density of 8 MW/km² over every grid cell inside a wind-farm area. Domain, grid (rotated pole, 0.045° ≈ 5 km, 789 × 558 cells), time period and output format are the same as in the control run: hourly data in monthly NetCDF files, proleptic Gregorian calendar, UTC. The variables are wind speed at 10 m and at 120 m (closest output level to the hub height) and total precipitation. The same layout was also run with 5 MW and 15 MW turbines, so these runs show how turbine size changes the wind-farm effects.