This dataset contains a COSMO-CLM (CCLM6) simulation for 2008–2017 that includes the offshore wind farms planned to be in operation by 2023 in the North Sea and the Baltic Sea. The wind farms are represented by the Fitch wind-farm parameterization, using the NREL 5 MW reference turbine with a 90 m hub height. The model places turbines at a density of 8 MW/km² over every grid cell inside a wind-farm area. Domain, grid (rotated pole, 0.045° ≈ 5 km, 789 × 558 cells), time period and output format are the same as in the control run: hourly data in monthly NetCDF files, proleptic Gregorian calendar, UTC. The variables are wind speed at 10 m and at 90 m (closest output level to the hub height) and total precipitation. Subtracting the control run gives the effect of the 2023 offshore wind build-out on wind speed, wakes and precipitation.