Downloads unavailable from 20-Jul-2026 7:00 CEST until 21-JUL-2026 12:00 CESTDue to maintenance all downloads will be unavavailable from monday, 20-JUL-2026, 7:00 CEST to tuesday, 21-JUL-2026, 12:00 CEST.
The Sodar/RASS device installed at Fussbach consisted of a DSDPA.90/64-Sodar and a DSDR3x7-1290MHz-RASS extension by METEK GmbH. It operated with an averaging period of 10 min. The minimum measurement